Filthy Future: The Staggering Cost of Cleaning Up ‘Clean’ Energy’s Toxic Mess

.
.
What really happens – if anything – to land-based wind turbines at the end of their brief working lives?

STOP THESE THINGS

Wind turbines don’t run on wind, they run on subsidies: cut the subsidies and once these things inevitably grind to a halt, they’ll never be replaced.

With an economic lifespan of something like 10-12 years (rather than the overblown 25 put forward by turbine makers and wind power outfits), over the next decade countries like Germany will be left with hundreds of thousands of 2-300 tonne ‘problems’ littering the landscape. With hundreds of turbines totally kaput, Germans have already been smacked with the harsh and toxic reality of their government’s so-called ‘green’ obsession.

And they aren’t alone.

Iowa’s wind industry has been going for barely a decade and already wind power outfits are sending thousands of tonnes of toxic waste to landfill.

In addition to 10-15 tonne toxic plastic and fibreglass blades, there’s a smorgasbord of toxic plastics, oils, lubricants, metals and fibreglass in the tower and nacelle; and…

View original post 448 more words

via Tallbloke’s Talkshop

https://ift.tt/2NpxQgw

October 29, 2019 at 05:00AM

Advertisements

One thought on “Filthy Future: The Staggering Cost of Cleaning Up ‘Clean’ Energy’s Toxic Mess”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s